INVITATION LETTER on Stakeholder Consultation Meeting to develop Ca Mau 1C Wind Power Plant under Gold Standard for Global Goals (GS4GG)

21-10-2022

 3,861 views

 3,861 views

To whom it may concern,

The Ca Mau 1C wind power plant project activity involves the construction of an off-shore wind power plant in Nguyen Huan communes, Dam Doi district, Ca Mau province, Viet Nam with a total capacity of 88 MW. The project involves the installation of 19 wind turbines – generators, an administrative office area house and a 220kV transformer station (2x250MVA-35/220kV). The purpose of the project activity is to generate power using renewable wind energy and export to the national grid. The use of clean and renewable energy contributes to environmental protection and is in line with the sustainable development goals.

To confirm the project’s contribution to environmental protection and sustainable development, we are currently cooperating with Energy and Environment Consultancy Joint Stock Company (VNEEC) and Swiss Carbon Value Ltd. to develop and register the Gold Standard (GS) for this project.

We would like to invite you to attend the meeting “Public consultation to develop Ca Mau 1C Wind Power Project under Gold Standard”

Time: 08:30 a.m to 12:00, November 22th, 2022

Place: People’s Committee of Nguyen Huan commune, Dam Doi district, Ca Mau province

Agenda and consultation content:

  • Opening, introducing delegates and meeting purpose.
  • Introduction of project activities including project design, applied technology, objectives, scale, construction progress, operation plan, introduction to the Gold Standard mechanism, and answers to questions relate to.
  • Exchanging and collecting assessment of delegates about the economic, social and environmental impacts of the project activities.
  • Evaluate the project’s suitability according to the criteria of sustainable development.
  • Discuss the monitoring mechanism for project parameters according to the sustainable development criteria.
  • Discuss the gender equality.
  • Discuss methods of collecting and responding to community’s comments on project activities in both construction and operation stages.
  • Conclude and agree on meeting minutes.

You can download relevant documents of this project at the google drive link: https://drive.google.com/file/d/1d-OK_DFEZ-ITfyZ6-ZtLvB2h20WKchC_/view?usp=sharing

Delegates who are unable to attend the meeting want to comment or need to clarify the technical details of the project, information about the Gold Standard mechanism, please contact us:

Mr. Pham Ngoc Trang – Project Manager; Tel: +84 914 770 033, Email: trangpn@wto.com.vn. Communicate directly or leave comments in the Comment Book located at: Ca Mau 1C Wind Power Plant office, Nguyễn Huân Commune, Dam Doi District, Ca Mau Province, Vietnam.

Mr. Nguyen Tien Hai – Gold Standard Consultant; Tel: 0977.434.790, Email: tienhai@eec.vn. Communicate directly or leave comments in the Comment Book located at: Energy and Environment Consultancy Joint Stock Company (VNEEC), 8 Floor, Diamond Flower building, 48 Le Van Luong, Thanh Xuan, Ha Noi.

Thank you very much./.